Careers360 Logo
IIM Mumbai Placements 2025: Highest and Average Packages, Top Recruiters

IIM Mumbai Placements 2025: Highest and Average Packages, Top Recruiters

Edited By Sundararajan | Updated on Sep 12, 2024 10:17 AM IST | #CAT

Indian Institute of Management (IIM), Mumbai, will soon release its MBA summer placement report 2025 on its official website, iimmumbai.ac.in. It is expected that the IIM Mumbai summer placement report for MBA batch 2025-27 will be available in the month of January 2025. Followed by the summer placement report, the authority will release the IIM Mumbai final placement report 2025 in the month of March. According to the last-year summer placement statistic, the highest and average package stipends were at Rs 4.80 LPA and Rs 2.27 LPA, respectively. The top recruiters during IIM Mumbai placements includes Adani, HSBC, Accenture, Cisco, Cognizant, Flipkart, Hero, etc.

IIM Mumbai Placements 2025: Key Highlights

As per the previous year IIM Mumbai final placement report, the highest and average package stood at Rs 54 LPA and Rs 47.29 LPA, respectively. During the previous year’s IIM Mumbai final placements, the top 50% of the MBA batch received an average package of Rs 33.84 LPA. Additionally, the median package of the IIM Mumbai final placement was Rs 28 LPA.

  • IIM Mumbai Recruiters: A total of 180 established recruiters and 67 new recruiters participate in the IIM Mumbai MBA final placement season.

  • IIM Mumbai Placement Committee: The IIM Mumbai Placement Committee works to bring in the top recruiters and facilitate smooth MBA/ PGDEX-VLFM/ DGMP recruitment processes.

  • Eligibility for IIM Mumbai Placement: Few recruiters have some guidelines and restrictions for participation in their campus interview process (i.e., 50% and above in all their academic qualification marks).

  • NIRF Ranking: In 2024, IIM Mumbai was ranked 6th in the management category by the National Institutional Ranking Framework.

Great Lakes - PGPM & PGDM 2025

Admissions Open | Globally Recognized by AACSB (US) & AMBA (UK) | 17.3 LPA Avg. CTC for PGPM 2024

GMAT™ Exam

Select test center appointment | Scores valid for 5 Years | Multiple Attempts | Round 1 Applications Closing Soon

Also Read: IIM Mumbai Fees

IIM Mumbai Placement Report 2025: Download Link

Check below link for direct download of IIM Mumbai placement report pdf.

Placement Season

Download Link

IIM Mumbai Summer Placement 2025

To be available

IIM Mumbai Final Placement 2025

To be available

Last Year IIM Mumbai Placement Report for MBA Programme

In this academic year, IIM Mumbai MBA placement 2025 will be released after completion of campus interview for both Summer and Final. Till then, students can check previous year IIM Mumbai placement report below.

IIM Mumbai Placement Report

Particulars

IIM Mumbai Placement 2024 Statistics

Total students

446 (Male: 373; Female: 73)

New recruiters

67

Total number of companies visited

180

PPOs Offered

170

Highest CTC

Rs 54 LPA

Median CTC for PPOs

Rs 28 LPA

Average CTC for PPOs

Rs 29.44 LPA

Top 50% Average

Rs 33.84 LPA

Top 20% Average

Rs 40.71 LPA

Top 10% Average

Rs 47.29 LPA

People also looking for; IIM Mumbai Admission Criteria

IIM Mumbai Placements: Work Experience Sectors

Sectors

Percentage

BFSI

10%

Consulting

18%

IT/Product Management

13%

Manufacturing

19%

Pharma

3%

Retail/ E-commerce

10%

Others

11%

IIM Mumbai Placements: Top Recruiters

Check out the list of top recruiters during IIM Mumbai placements below:

P&G

Wipro

Adani

Deloitte

IDFC First

KPMG

Genpact

Hero

ITC

Asian Paints

Max

SBI

CISCO

HSBC

Zepto

Sprinklr

IIM Mumbai Placement Comparison: With Other IIMs

The table below compares IIM Mumbai MBA placements with other nearby IIMs:

IIM Name

Highest Package

Average Package

IIM Shillong

Rs 71.50 LPA

Rs 26.10 LPA

IIM Visakhapatnam

Rs 42.35 LPA

Rs 15.61 LPA

IIM Raipur

Rs 43.4 LPA

Rs 19.7 LPA

IIM Jammu

Rs 32 LPA (MBA HA & HM)

Rs 14.01 LPA

Articles

Certifications By Top Providers

Explore Top Universities Across Globe

Questions related to CAT

Have a question related to CAT ?

Hello,

No, you cannot select the NC-OBC (Non-Creamy Layer Other Backward Classes) section in the CAT registration form if you belong to the RBA (Reserved Backward Area) category, even if your family income is less than Rs. 8 lakhs.

The NC-OBC category in the CAT registration form is specifically for candidates who belong to the Non-Creamy Layer of the Other Backward Classes (OBC) as per the central government’s list of OBCs. The RBA category is a separate category applicable mainly in states like Jammu & Kashmir, and it does not fall under the central OBC category.

If you belong to the RBA category, you should select the appropriate category you qualify for in the CAT registration form (General, SC, ST, EWS, or any other applicable category based on state or central government recognition).

Hope it helps !

Hello there,

With a 97 percentile in CAT mocks, you have a strong chance of getting into a top MBA college, especially if you can maintain or improve this percentile in the actual exam. However, admission to top IIMs or other premier institutes (like IIM A, B, C, FMS, etc.) also considers factors like:

1. Academic Profile: Your 10th and 12th marks are somewhat below the typical benchmarks set by the top IIMs, but your B.Tech CGPA is strong.

2. Work Experience (if applicable): Relevant work experience can significantly boost your profile.

3. Diversity Factor: Some colleges give weightage to academic diversity or gender diversity, which could benefit you depending on your profile.


4. Interview and GD/PI Performance: Performing well in the group discussions, written ability test, and personal interviews is critical.

For Tier-1 MBA colleges, if your CAT score remains at or above 97 percentile, you have a fair chance, but your slightly lower 10th and 12th scores may be a minor disadvantage at top IIMs. However, you should still be competitive for other top institutes like MDI, SPJIMR, IITs (for MBA), and others. Keep focusing on your CAT preparation to secure the best percentile possible.

Hope it helps Thankyou!

If you don't get confirmation email you should check your email id once again including junk spam folder sometimes confirmation email are delayed yo may get in 24-48 hours.

Also,you can log in to your cat registration account to verify your form

Lastly,reach out cat helpline via phone and email cathelpdesk@Iimcat.ac.in.

you need to fill number of months for which you have work ex and may be domain of work ex as well in cat form.write the industry within which you are currently working or which is the closest option you have.basically Forensic science is a multidisciplinary field so you can add this also, you must have salary slip, joining letter,work experience letter if you are claiming it.

BEST OF LUCK!!!

If your Non-Creamy Layer (NC-OBC) certificate is delayed, you can still fill out the CAT form using the provisional certificate available on the CAT website, which declares that you fall under the NC-OBC category. This temporary certificate is provided for candidates facing delays in obtaining the updated certificate. However, you will be required to submit the official, updated NC-OBC certificate during the selection process or interviews.


Ensure that the provisional certificate is correctly filled out, and keep track of when your updated certificate will be issued, as failing to present the official document during later stages could impact your category-based claims for admission. Most institutions will accept this provisional certificate for the purpose of application submission, but it is important to meet all final documentation requirements by the time of admission.


Check the CAT guidelines and the institution's specific instructions regarding such documents to avoid any discrepancies .

Directions for question :

M/s Deloitte Touche Tohmatsu Limited, one of the top four audit and accounting firms in the world with headquarters at London, UK, and with an operational presence in 153 countries, hires Management Trainees (MT) from all the premier management institutes of India thrice every year, in the months of January, May and September.

Each new group of Management Trainees (MT) have to go through a four month rigorous training schedule, after which they have to pass through a test consisting of a written assessment and a case-analysis. The top hundred ranked Management Trainees (MT) based on the performance in the test are confirmed as Management Executives (ME). The rest are given the opportunity of undergoing the training for four months one more time along with the next batch of Management Trainees (MT) and then passing through the subsequent test consisting of the written assessment and case-analysis. The Management Trainee (MT) who fails to get confirmed as a Management Executive (ME) the second time is fired.

The scatter-graph below depicts the number of Management Trainees (MT) at Deloitte taking the tests from January 2020 till May 2022, and the vis-à-vis hired Management Trainees (MT) at Deloitte who were fired :

It is also known that for the month of September 2019 at Deloitte, 96 hired Management Trainees (MT) failed to be confirmed as a Management Executive (ME) the first time, and that 36 hired Management Trainees (MT) were fired. 

Question :

In which test did the minimum number of Management Trainees (MT) get confirmed as a Management Executive (ME) in the second attempt ?

Option: 1

September 2020

 

 


Option: 2

May 2021


Option: 3

January 2021

 


Option: 4

January 2022 


Directions for question:

Two friends Moloy and Niloy passed out from the Purulia Institute of Science and Technology with B.Tech degrees in Mechanical Engineering, but even after a year placement was hard to find. So they decided to take the challenge head-on, came down to Kolkata, rented a garage space on Park Street, and having an affinity towards making people enjoy good food, started their firm named 'B.Tech Bread-Omlette Wala'. 

They started with three items on the menu. One was the French Toast which could be prepared in 3 minutes. The second was the Egg Tortillas which took 15 minutes to prepare. Any one of Moloy and Niloy could prepare any one of them at a time. The third was the Egg Bhurji with French Fries. This however was prepared on an automated fryer which could prepare 3 servings at a time and took 5 minutes irrespective of the number of servings equal to or below 3. The fryer did not need anyone to attend to it, and the time to put in the raw ingredients could be neglected. So one could tend to the preparation of other items while the Egg Bhurji with French Fries were being prepared. 

They wanted to serve the orders as early as possible after the order was given. The individual items in any order were served as and when all the items were ready, and the order was then considered closed. None of the items on the menu were prepared in advance in anticipation of future orders. 

On the first day, 3 groups of customers came in and ordered at 6.00 pm, 6.10 pm, and 6.13 pm. The first order was for a plate of Egg Tortillas, two plates of French Toast, and three plates of Egg Bhurji with French Fries. The second order was for a plate of French Toast and two plates of Egg Bhurji with French Fries. The third order was for a plate of Egg Tortilla and a plate of Egg Bhurji with French Fries. 

On the backdrop of the above information answer the questions given :

Question: 

Assuming that the next customer's order could only be attended to when the previous customer's order was closed, at what time would the first customer's order be considered closed ?

 

Option: 1

6.15 pm

 

 


Option: 2

6.17 pm

 


Option: 3

6.18 pm

 


Option: 4

6.20 pm


Directions for question :

Six sticks of equal lengths were kept in the vertical position in an empty flower-vase, to be arranged at the six corners of a regular hexagon. The two ends of each of the sticks were of different colours. 

The top ends of the sticks were one of each of the following colours – Red, Cyan, Pink, Brown, Black and Green. The bottom ends were one of each of the following colours – Blue, Yellow, White, Orange, Purple and Grey. Both the sets of colours mentioned were in no particular order.

It was also known that :

a) The stick with the red colour was opposite to the stick with the blue colour

b) There were exactly two sticks whose both ends had colours whose names started with the same letter

c) The stick with the grey colour was adjacent to the stick with the white colour

d) The stick with the cyan colour was adjacent to both the sticks with the brown colour and the one with the blue colour

e) The stick with the purple colour was adjacent to both the sticks with the grey colour and the one with the green colour

f) The stick with the white colour was opposite to the stick with the green colour

Question :

What was the colour of the bottom end of the stick having brown colour at the top end ?

Option: 1

 White 

 


Option: 2

Yellow 


Option: 3

Black

 


Option: 4

Grey


Directions for question:

Two friends Moloy and Niloy passed out from the Purulia Institute of Science and Technology with B.Tech degrees in Mechanical Engineering, but even after a year placement was hard to find. So they decided to take the challenge head-on, came down to Kolkata, rented a garage space on Park Street, and having an affinity towards making people enjoy good food, started their firm named 'B.Tech Bread-Omlette Wala'. 

They started with three items on the menu. One was the French Toast which could be prepared in 3 minutes. The second was the Egg Tortillas which took 15 minutes to prepare. Any one of Moloy and Niloy could prepare any one of them at a time. The third was the Egg Bhurji with French Fries. This however was prepared on an automated fryer which could prepare 3 servings at a time and took 5 minutes irrespective of the number of servings equal to or below 3. The fryer did not need anyone to attend to it, and the time to put in the raw ingredients could be neglected. So one could tend to the preparation of other items while the Egg Bhurji with French Fries were being prepared. 

They wanted to serve the orders as early as possible after the order was given. The individual items in any order were served as and when all the items were ready, and the order was then considered closed. None of the items on the menu were prepared in advance in anticipation of future orders. 

On the first day, 3 groups of customers came in and ordered at 6.00 pm, 6.10 pm, and 6.13 pm. The first order was for a plate of Egg Tortillas, two plates of French Toast, and three plates of Egg Bhurji with French Fries. The second order was for a plate of French Toast and two plates of Egg Bhurji with French Fries. The third order was for a plate of Egg Tortilla and a plate of Egg Bhurji with French Fries. 

On the backdrop of the above information answer the questions given :

Question: 

Assuming that the next customer's order could only be attended to when the previous customer's order was closed, at what time would the third customer's order be considered closed ?

 

Option: 1

6.28 pm

 


Option: 2

6.35 pm

 


Option: 3

6.38 pm


Option: 4

6.45 pm


Directions for question:

Two friends Moloy and Niloy passed out from the Purulia Institute of Science and Technology with B.Tech degrees in Mechanical Engineering, but even after a year placement was hard to find. So they decided to take the challenge head-on, came down to Kolkata, rented a garage space on Park Street, and having an affinity towards making people enjoy good food, started their firm named 'B.Tech Bread-Omlette Wala'. 

They started with three items on the menu. One was the French Toast which could be prepared in 3 minutes. The second was the Egg Tortillas which took 15 minutes to prepare. Any one of Moloy and Niloy could prepare any one of them at a time. The third was the Egg Bhurji with French Fries. This however was prepared on an automated fryer which could prepare 3 servings at a time and took 5 minutes irrespective of the number of servings equal to or below 3. The fryer did not need anyone to attend to it, and the time to put in the raw ingredients could be neglected. So one could tend to the preparation of other items while the Egg Bhurji with French Fries were being prepared. 

They wanted to serve the orders as early as possible after the order was given. The individual items in any order were served as and when all the items were ready, and the order was then considered closed. None of the items on the menu were prepared in advance in anticipation of future orders. 

On the first day, 3 groups of customers came in and ordered at 6.00 pm, 6.10 pm, and 6.13 pm. The first order was for a plate of Egg Tortillas, two plates of French Toast, and three plates of Egg Bhurji with French Fries. The second order was for a plate of French Toast and two plates of Egg Bhurji with French Fries. The third order was for a plate of Egg Tortilla and a plate of Egg Bhurji with French Fries. 

On the backdrop of the above information answer the questions given :

Question: 

Suppose Moloy and Niloy had decided to process multiple orders at the same time, however strictly prioritising a first come first serve basis, when would the second customer's order be considered closed ?

Option: 1

6.20 pm

 

 


Option: 2

6.18 pm


Option: 3

6.15 pm

 


Option: 4

6.12 pm


Directions for question:

Two friends Moloy and Niloy passed out from the Purulia Institute of Science and Technology with B.Tech degrees in Mechanical Engineering, but even after a year placement was hard to find. So they decided to take the challenge head-on, came down to Kolkata, rented a garage space on Park Street, and having an affinity towards making people enjoy good food, started their firm named 'B.Tech Bread-Omlette Wala'. 

They started with three items on the menu. One was the French Toast which could be prepared in 3 minutes. The second was the Egg Tortillas which took 15 minutes to prepare. Any one of Moloy and Niloy could prepare any one of them at a time. The third was the Egg Bhurji with French Fries. This however was prepared on an automated fryer which could prepare 3 servings at a time and took 5 minutes irrespective of the number of servings equal to or below 3. The fryer did not need anyone to attend to it, and the time to put in the raw ingredients could be neglected. So one could tend to the preparation of other items while the Egg Bhurji with French Fries were being prepared. 

They wanted to serve the orders as early as possible after the order was given. The individual items in any order were served as and when all the items were ready, and the order was then considered closed. None of the items on the menu were prepared in advance in anticipation of future orders. 

On the first day, 3 groups of customers came in and ordered at 6.00 pm, 6.10 pm, and 6.13 pm. The first order was for a plate of Egg Tortillas, two plates of French Toast, and three plates of Egg Bhurji with French Fries. The second order was for a plate of French Toast and two plates of Egg Bhurji with French Fries. The third order was for a plate of Egg Tortilla and a plate of Egg Bhurji with French Fries. 

On the backdrop of the above information answer the questions given :

Question: 

Suppose Moloy and Niloy had decided to process multiple orders at the same time, however strictly prioritising a first come first serve basis, when would the third customer's order be considered closed ?

 

Option: 1

6.22 pm

 


Option: 2

6.25 pm


Option: 3

6.28 pm 


Option: 4

6.30 pm


Directions for question:

Two friends Moloy and Niloy passed out from the Purulia Institute of Science and Technology with B.Tech degrees in Mechanical Engineering, but even after a year placement was hard to find. So they decided to take the challenge head-on, came down to Kolkata, rented a garage space on Park Street, and having an affinity towards making people enjoy good food, started their firm named 'B.Tech Bread-Omlette Wala'. 

They started with three items on the menu. One was the French Toast which could be prepared in 3 minutes. The second was the Egg Tortillas which took 15 minutes to prepare. Any one of Moloy and Niloy could prepare any one of them at a time. The third was the Egg Bhurji with French Fries. This however was prepared on an automated fryer which could prepare 3 servings at a time and took 5 minutes irrespective of the number of servings equal to or below 3. The fryer did not need anyone to attend to it, and the time to put in the raw ingredients could be neglected. So one could tend to the preparation of other items while the Egg Bhurji with French Fries were being prepared. 

They wanted to serve the orders as early as possible after the order was given. The individual items in any order were served as and when all the items were ready, and the order was then considered closed. None of the items on the menu were prepared in advance in anticipation of future orders. 

On the first day, 3 groups of customers came in and ordered at 6.00 pm, 6.10 pm, and 6.13 pm. The first order was for a plate of Egg Tortillas, two plates of French Toast, and three plates of Egg Bhurji with French Fries. The second order was for a plate of French Toast and two plates of Egg Bhurji with French Fries. The third order was for a plate of Egg Tortilla and a plate of Egg Bhurji with French Fries. 

On the backdrop of the above information answer the questions given :

Question: 

A fourth customer comes in and orders two plates of French Toast at 6.24 pm. Suppose Moloy and Niloy had decided to process multiple orders at the same time, however strictly prioritising a first come first serve basis. For exactly how many minutes would one of the friends be idle from 6.00 pm till serving the last customer, assuming that the four customers were the only ones to have come in within the period being discussed ?

Option: 1

9

 


Option: 2

13


Option: 3

18


Option: 4

21


Directions for question:

Two friends Moloy and Niloy passed out from the Purulia Institute of Science and Technology with B.Tech degrees in Mechanical Engineering, but even after a year placement was hard to find. So they decided to take the challenge head-on, came down to Kolkata, rented a garage space on Park Street, and having an affinity towards making people enjoy good food, started their firm named 'B.Tech Bread-Omlette Wala'. 

They started with three items on the menu. One was the French Toast which could be prepared in 3 minutes. The second was the Egg Tortillas which took 15 minutes to prepare. Any one of Moloy and Niloy could prepare any one of them at a time. The third was the Egg Bhurji with French Fries. This however was prepared on an automated fryer which could prepare 3 servings at a time and took 5 minutes irrespective of the number of servings equal to or below 3. The fryer did not need anyone to attend to it, and the time to put in the raw ingredients could be neglected. So one could tend to the preparation of other items while the Egg Bhurji with French Fries were being prepared. 

They wanted to serve the orders as early as possible after the order was given. The individual items in any order were served as and when all the items were ready, and the order was then considered closed. None of the items on the menu were prepared in advance in anticipation of future orders. 

On the first day, 3 groups of customers came in and ordered at 6.00 pm, 6.10 pm, and 6.13 pm. The first order was for a plate of Egg Tortillas, two plates of French Toast, and three plates of Egg Bhurji with French Fries. The second order was for a plate of French Toast and two plates of Egg Bhurji with French Fries. The third order was for a plate of Egg Tortilla and a plate of Egg Bhurji with French Fries. 

On the backdrop of the above information answer the questions given :

Question: 

Had Niloy been absent on that day, and assuming that the next customer's order could only be attended to when the previous customer's order was closed, at what time would the fourth customer's order (refer to the previous question) be considered closed ?

Option: 1

6:38 pm

 


Option: 2

6:42 pm

 


Option: 3

6:47 pm


Option: 4

6:49 pm


Directions for question:

The bar-graph given below shows the foreign exchange reserves of Nepal (in million Rupees) from 2014 to 2021. Answer the following questions based on the graph :

Question:

What was the percentage increase (rounded to the nearest integer, if deemed necessary) in the foreign exchange reserves in 2020 over 2016 ?

Option: 1 None

Option: 2 None

Option: 3 None

Option: 4 None

Directions for question:

The Jadavpur University’s Prince Anwar Shah Road hostel consists of two large separate buildings, one for the ladies and the other for the gents, while having a common kitchen and dining hall. It is the hostel of the CS and the EEC department of engineering students of the university.

In recognition of the growing dissatisfaction and hence complaints among the inmates of the hostel regarding the menu served for dinner, the Dean of the engineering department, Dr Aparesh Sanyal, personally decided to investigate the matter. He set about collecting information about the preference of dinner among the inmates, separately from the gents and the ladies wing of the hostel.

Dr Sanyal was able to gather the following partial information :  

 

Hostel inmates

Menu preference for dinner

Total

Egg Meal

Fish Meal

Chicken Meal

Gents

   

20

 

Ladies

     

64

Total

 

60

   

 

The Warden of the hostel was consulted, who after investigation declared that the following facts were clear :

1. Forty percent of the hostel inmates were ladies

2. One-third of the gentlemen inmates preferred an egg meal for dinner

3. Half the hostel inmates preferred either fish meal or chicken meal

Question:

What proportion of the lady hostel inmates preferred a fish meal for dinner ?

 

 

Option: 1

0.25

 

 


Option: 2

0.50

 


Option: 3

0.75

 


Option: 4

1.00 


Marketing Director

A career as Marketing Director is also known as a marketing expert who is responsible for the overall marketing aspect of the company. He or she oversees plans and develops the company's budget. The marketing Director collaborates with the business team to plan and develop the marketing and branding strategies for the company's products or services. 

4 Jobs Available
Content Marketing Specialist

Content Marketing Specialists are also known as Content Specialists. They are responsible for crafting content, editing and developing it to meet the requirements of digital marketing campaigns. To ensure that the material created is consistent with the overall aims of a digital marketing campaign, content marketing specialists work closely with SEO and digital marketing professionals.

3 Jobs Available
Sales Manager
2 Jobs Available
Business Analyst
2 Jobs Available
Marketing Manager
2 Jobs Available
SEO Analyst

An SEO Analyst is a web professional who is proficient in the implementation of SEO strategies to target more keywords to improve the reach of the content on search engines. He or she provides support to acquire the goals and success of the client’s campaigns. 

2 Jobs Available
Digital Marketing Executive

Digital marketing is growing, diverse, and is covering a wide variety of career paths. Each job function aids in the development of effective digital marketing strategies and techniques. The aims and objectives of the individuals who opt for a career as a digital marketing executive are similar to those of a marketing professional: to build brand awareness, promote company services or products, and increase conversions. Individuals who opt for a career as Digital Marketing Executives, unlike traditional marketing companies, communicate effectively through suitable technology platforms.

2 Jobs Available
Back to top