Executive MBA vs MBA: What is Difference Between MBA and Executive MBA?

Executive MBA vs MBA: What is Difference Between MBA and Executive MBA?

Edited By Himanshu Shekhar | Updated on Feb 18, 2025 11:50 AM IST | #CAT

An executive MBA vs MBA can be a confusing choice for candidates wanting to pursue a career in the field of business management and administration. The executive MBA vs MBA analysis can be helpful to understand the advantages and disadvantages of each one. Although both executive MBA vs MBA present a set of unique challenges and opportunities it is up to the personal preference of individual candidates. The major difference between the two is the requirement of work experience. This article is a comparative study of both programs on different parameters for candidates to make an overall better decision.

This Story also Contains
  1. Executive MBA vs MBA
  2. Executive MBA vs MBA Key Differences
  3. Executive MBA vs MBA Pros and Cons
  4. Executive MBA vs MBA Which one to choose
Executive MBA vs MBA: What is Difference Between MBA and Executive MBA?
Executive MBA vs MBA: What is Difference Between MBA and Executive MBA?

Executive MBA vs MBA

An executive MBA is generally for working professionals who have acquired some work experience (at least 3 to 5 years) in a specific domain. It's for those looking to enhance their skills and knowledge and become eligible for senior management roles in different organizations. A traditional MBA on the other hand is for candidates with little to no work experience who want a strong foundation in their management careers. Both allow candidates to choose specific specializations based on their career goals and interests.

Executive MBA vs MBA Key Differences

The key differences between executive MBA vs MBA are mentioned in the table below.

Criteria

Executive MBA

MBA

Suited For

Professionals with significant work experience (at least 3 to 5 years).

Candidates with no to very little work experience.

Careers Stage

Mid to senior level, aiming for seniority, executive roles.

Early career stage or transition into new roles or industries.

Program Structure

Classes on weekends or in intensive blocks.

Full-time or part-time with a structured program curriculum.

Duration

18 to 24 months

24 Months

Flexibility

Designed for working professionals, allows for continued employment.

Full-time programs. Compulsory on-campus residence for certain B-Schools.

Curriculum Focus

Advanced concepts, strategic management, senior leadership

Core business subjects include finance, operations, marketing, and management.

Practical Application

Directly tied to the candidate's current roles

Includes internships and projects, that may not be directly related.

Cost

Generally Expensive.

Expensive depending on how premium the B-School is.

ROI

Has a high ROI with immediate applicability and potential for rapid career advancement.

Potentially high across diverse roles.

Career Impact

Enhances leadership qualities, and prepares for senior roles.

Provides broad business education, beneficial for career advancement and change.

Executive MBA vs MBA Pros and Cons

The executive MBA vs MBA pros and cons are listed in the table below.

Executive MBA

Pros

Cons

  • Advanced Curriculum

  • High Cost

  • Immediate Application

  • Time Commitment

  • Leadership Development

  • Intense Schedule

  • Employer Sponsorship

  • Program Rigidity

  • Peer Learning

  • May not fit all career goals

MBA

Pros

Cons

  • Broader Business Knowledge

  • Less Technical Aspect

  • Versatile

  • Generalist Approach

  • Networking Opportunities

  • Expensive

  • Strategic Thinking

  • Market-based Demand for professionals

  • Diverse Career Paths

  • Lack of Depth

Executive MBA vs MBA Which one to choose

Finally, an executive MBA is ideal for candidates with work experience, who aspire for senior leadership and management roles. It will suit candidates who are looking to enhance their leadership skills and strategic thinking, and preparing for high-level executive positions.

A traditional MBA is for individuals who are just starting to build a broad business foundation or make a significant career transition. It will help them gain a comprehensive understanding of business principles, transition to a new industry, or advance in their career from an early stage.

Frequently Asked Questions (FAQs)

1. Is an executive MBA better than an MBA?

An executive MBA is generally for working professionals who have acquired some work experience (at least 3 to 5 years) in a specific domain. A traditional MBA on the other hand is for candidates with little to no work experience who want a strong foundation in their management careers.

2. Who earns more, an MBA or an Executive MBA?

From an earnings perspective both an MBA and an executive MBA are compensated with similar salary structures. The salaries would depend on factors like job role, specialization, etc to a large extent.

3. How much does an Executive MBA cost in India?

The cost for an executive MBA can vary from Rs. 2 lakhs to as high as Rs. 30 lakhs depending on the college and the program structure. There are a variety of colleges that offer the executive MBA program for a low price.

4. Is 2 year Executive MBA worth it?

An Executive MBA from IIM can give a significant boost when it comes to your career and professional aspirations. For all the cases, it's worthwhile to invest your time and hard work into one. Candidates are found to receive promotions and higher salary packages in their professional circles after an Executive MBA.

5. Is Executive MBA is equal to Masters?

Executive Master of Business Administration (MBA) is a degree program similar to flag ship Master of Business Administration (MBA) program but specially designed for corporate executives and senior managers already in the workforce.

Articles

Certifications By Top Providers

Post Graduation Programme in Digital Marketing
Via Indian Institute of Digital Education
MBA Finance
Via Birla Institute of Technology and Science, Pilani
Digital Banking Business Model
Via State Bank of India
Management of Commercial Banking
Via Indian Institute of Technology Kharagpur
MBA Business Analytics
Via Birla Institute of Technology and Science, Pilani
Udemy
 703 courses
Edx
 467 courses
Emeritus
 229 courses
Swayam
 219 courses
Coursera
 215 courses

Explore Top Universities Across Globe

University of Essex, Colchester
 Wivenhoe Park Colchester CO4 3SQ
Queen Mary University of London, London
 Mile End Road, London E1 4NS
University of Strathclyde, Glasgow
 16 Richmond St, Glasgow G1 1XQ
Oxford Brookes University, Oxford
 Headington Campus Oxford OX3 0BP UK
Northumbria University, Newcastle City Campus
 Sutherland Building, Northumberland Road, Newcastle-upon-Tyne, NE1 8ST
Cardiff Metropolitan University, Cardiff
 Llandaff Campus, Western Avenue, Cardiff, CF5 2YB
Magister Jurisdiction
4 minMar 18, 2023 16:03 PM IST
GMAT Exam Dates 2025: City Wise Test Schedule in India
13 minDec 31, 2024 03:12 AM IST

Questions related to CAT

Have a question related to CAT ?

Hello

If you are aiming for the CAT exam this year and considering joining the fourth year, it might be a good idea if you are confident in managing both your academic workload and CAT preparation .

However, the CAT exam is competitive and balancing your BCom studies and preparation might be challenging.

If you think you can handle the extra year and need more time for focused preparation , joining the fourth year could provide that but you should also evaluate your current academic commitments and your ability to stay consistent with CAT preparation .

Hope this gives you the clarity you need.

Hello,

Securing a seat in a National Institute of Technology (NIT) with a JEE Main score of 67 as an SC category candidate is challenging. Consider the following points:

  • Qualifying Cutoff : The expected qualifying cutoff for SC candidates in JEE Main 2025 is around 65 marks.

  • Admission Prospects : While you may qualify for JEE Advanced, admission to NITs typically requires higher scores. For instance, in previous years, SC candidates needed higher marks to secure seats in NITs.

  • Improvement Opportunity : Consider preparing for the next JEE Main attempt to achieve a higher score, thereby enhancing admission prospects in subsequent counseling rounds.

You can also use the JEE Mains College Predictor Tool to predict which college you can get based on your score.

Hope you find it useful!

Hello,

With an 88 percentile in the JEE Main exam and belonging to the SC category from Karnataka, your chances of securing a Computer Science Engineering (CSE) seat in NITs, IIITs, or GFTIs are as follows:

  • NITs :

    • Top NITs like NIT Trichy or NIT Surathkal have higher cutoffs for CSE. For instance, in 2024, the closing rank for SC category in CSE at NIT Trichy was around 1,171.
    • With an 88 percentile, your rank might be higher than these cutoffs, making it challenging to secure a CSE seat in top NITs.
  • IIITs :

    • IIITs also have competitive cutoffs for CSE. For example, IIITM Gwalior had a closing rank of 11,494 in 2024, making it highly competitive.
    • Your current percentile may not meet the typical cutoffs for CSE in top IIITs.
  • GFTIs :

    • GFTIs generally have higher closing ranks compared to NITs and IIITs, providing a more accessible option.
    • You may have a better chance of securing a CSE seat in GFTIs with your current percentile.

Hope you find it useful !

Hello,

According to the NIFT 2025 exam schedule , the General Ability Test (GAT) is from 9:00 AM to 11:00 AM, and the Creative Ability Test (CAT) is from 2:30 PM to 5:30 PM. This indicates a gap of 3.5 hours between the two tests.

The official guidelines do not specify whether candidates are allowed to leave the exam center during this interval. Therefore, it's advisable to:

  1. Check the Admit Card : Specific instructions regarding breaks may be mentioned.

  2. Contact the Exam Center : Reach out directly to confirm their policy on leaving during the interval.

By taking these steps, you can ensure compliance with the exam center's policies and plan your day effectively.

Hope you find it useful !

The CDAC C-CAT exam dates for the August 2025 batch haven't been announced yet. However, I can provide you with some information on the exam schedule for the February 2025 batch, which might give us an idea of what to expect for the August batch.


The CDAC C-CAT exam for the February 2025 batch was held on January 11 and 12, 2025.The application form for the February batch was available from November 2024 to December 30, 2024.


Typically, the CDAC C-CAT exam is conducted twice a year, in June and December, for admissions to the August and February batches, respectively. However, the exact dates for the August 2025 batch will be announced separately.


To stay updated on the CDAC C-CAT exam dates and other important events, I recommend checking the official CDAC website regularly.

BEST OF LUCK!!

View All

Directions for question :

M/s Deloitte Touche Tohmatsu Limited, one of the top four audit and accounting firms in the world with headquarters at London, UK, and with an operational presence in 153 countries, hires Management Trainees (MT) from all the premier management institutes of India thrice every year, in the months of January, May and September.

Each new group of Management Trainees (MT) have to go through a four month rigorous training schedule, after which they have to pass through a test consisting of a written assessment and a case-analysis. The top hundred ranked Management Trainees (MT) based on the performance in the test are confirmed as Management Executives (ME). The rest are given the opportunity of undergoing the training for four months one more time along with the next batch of Management Trainees (MT) and then passing through the subsequent test consisting of the written assessment and case-analysis. The Management Trainee (MT) who fails to get confirmed as a Management Executive (ME) the second time is fired.

The scatter-graph below depicts the number of Management Trainees (MT) at Deloitte taking the tests from January 2020 till May 2022, and the vis-à-vis hired Management Trainees (MT) at Deloitte who were fired :

It is also known that for the month of September 2019 at Deloitte, 96 hired Management Trainees (MT) failed to be confirmed as a Management Executive (ME) the first time, and that 36 hired Management Trainees (MT) were fired. 

Question :

In which test did the minimum number of Management Trainees (MT) get confirmed as a Management Executive (ME) in the second attempt ?

Option: 1

September 2020

 

 


Option: 2

May 2021


Option: 3

January 2021

 


Option: 4

January 2022 


Directions for question:

Two friends Moloy and Niloy passed out from the Purulia Institute of Science and Technology with B.Tech degrees in Mechanical Engineering, but even after a year placement was hard to find. So they decided to take the challenge head-on, came down to Kolkata, rented a garage space on Park Street, and having an affinity towards making people enjoy good food, started their firm named 'B.Tech Bread-Omlette Wala'. 

They started with three items on the menu. One was the French Toast which could be prepared in 3 minutes. The second was the Egg Tortillas which took 15 minutes to prepare. Any one of Moloy and Niloy could prepare any one of them at a time. The third was the Egg Bhurji with French Fries. This however was prepared on an automated fryer which could prepare 3 servings at a time and took 5 minutes irrespective of the number of servings equal to or below 3. The fryer did not need anyone to attend to it, and the time to put in the raw ingredients could be neglected. So one could tend to the preparation of other items while the Egg Bhurji with French Fries were being prepared. 

They wanted to serve the orders as early as possible after the order was given. The individual items in any order were served as and when all the items were ready, and the order was then considered closed. None of the items on the menu were prepared in advance in anticipation of future orders. 

On the first day, 3 groups of customers came in and ordered at 6.00 pm, 6.10 pm, and 6.13 pm. The first order was for a plate of Egg Tortillas, two plates of French Toast, and three plates of Egg Bhurji with French Fries. The second order was for a plate of French Toast and two plates of Egg Bhurji with French Fries. The third order was for a plate of Egg Tortilla and a plate of Egg Bhurji with French Fries. 

On the backdrop of the above information answer the questions given :

Question: 

Assuming that the next customer's order could only be attended to when the previous customer's order was closed, at what time would the first customer's order be considered closed ?

 

Option: 1

6.15 pm

 

 


Option: 2

6.17 pm

 


Option: 3

6.18 pm

 


Option: 4

6.20 pm


Directions for question :

Six sticks of equal lengths were kept in the vertical position in an empty flower-vase, to be arranged at the six corners of a regular hexagon. The two ends of each of the sticks were of different colours. 

The top ends of the sticks were one of each of the following colours – Red, Cyan, Pink, Brown, Black and Green. The bottom ends were one of each of the following colours – Blue, Yellow, White, Orange, Purple and Grey. Both the sets of colours mentioned were in no particular order.

It was also known that :

a) The stick with the red colour was opposite to the stick with the blue colour

b) There were exactly two sticks whose both ends had colours whose names started with the same letter

c) The stick with the grey colour was adjacent to the stick with the white colour

d) The stick with the cyan colour was adjacent to both the sticks with the brown colour and the one with the blue colour

e) The stick with the purple colour was adjacent to both the sticks with the grey colour and the one with the green colour

f) The stick with the white colour was opposite to the stick with the green colour

Question :

What was the colour of the bottom end of the stick having brown colour at the top end ?

Option: 1

 White 

 


Option: 2

Yellow 


Option: 3

Black

 


Option: 4

Grey


Directions for question:

Two friends Moloy and Niloy passed out from the Purulia Institute of Science and Technology with B.Tech degrees in Mechanical Engineering, but even after a year placement was hard to find. So they decided to take the challenge head-on, came down to Kolkata, rented a garage space on Park Street, and having an affinity towards making people enjoy good food, started their firm named 'B.Tech Bread-Omlette Wala'. 

They started with three items on the menu. One was the French Toast which could be prepared in 3 minutes. The second was the Egg Tortillas which took 15 minutes to prepare. Any one of Moloy and Niloy could prepare any one of them at a time. The third was the Egg Bhurji with French Fries. This however was prepared on an automated fryer which could prepare 3 servings at a time and took 5 minutes irrespective of the number of servings equal to or below 3. The fryer did not need anyone to attend to it, and the time to put in the raw ingredients could be neglected. So one could tend to the preparation of other items while the Egg Bhurji with French Fries were being prepared. 

They wanted to serve the orders as early as possible after the order was given. The individual items in any order were served as and when all the items were ready, and the order was then considered closed. None of the items on the menu were prepared in advance in anticipation of future orders. 

On the first day, 3 groups of customers came in and ordered at 6.00 pm, 6.10 pm, and 6.13 pm. The first order was for a plate of Egg Tortillas, two plates of French Toast, and three plates of Egg Bhurji with French Fries. The second order was for a plate of French Toast and two plates of Egg Bhurji with French Fries. The third order was for a plate of Egg Tortilla and a plate of Egg Bhurji with French Fries. 

On the backdrop of the above information answer the questions given :

Question: 

Assuming that the next customer's order could only be attended to when the previous customer's order was closed, at what time would the third customer's order be considered closed ?

 

Option: 1

6.28 pm

 


Option: 2

6.35 pm

 


Option: 3

6.38 pm


Option: 4

6.45 pm


Directions for question:

Two friends Moloy and Niloy passed out from the Purulia Institute of Science and Technology with B.Tech degrees in Mechanical Engineering, but even after a year placement was hard to find. So they decided to take the challenge head-on, came down to Kolkata, rented a garage space on Park Street, and having an affinity towards making people enjoy good food, started their firm named 'B.Tech Bread-Omlette Wala'. 

They started with three items on the menu. One was the French Toast which could be prepared in 3 minutes. The second was the Egg Tortillas which took 15 minutes to prepare. Any one of Moloy and Niloy could prepare any one of them at a time. The third was the Egg Bhurji with French Fries. This however was prepared on an automated fryer which could prepare 3 servings at a time and took 5 minutes irrespective of the number of servings equal to or below 3. The fryer did not need anyone to attend to it, and the time to put in the raw ingredients could be neglected. So one could tend to the preparation of other items while the Egg Bhurji with French Fries were being prepared. 

They wanted to serve the orders as early as possible after the order was given. The individual items in any order were served as and when all the items were ready, and the order was then considered closed. None of the items on the menu were prepared in advance in anticipation of future orders. 

On the first day, 3 groups of customers came in and ordered at 6.00 pm, 6.10 pm, and 6.13 pm. The first order was for a plate of Egg Tortillas, two plates of French Toast, and three plates of Egg Bhurji with French Fries. The second order was for a plate of French Toast and two plates of Egg Bhurji with French Fries. The third order was for a plate of Egg Tortilla and a plate of Egg Bhurji with French Fries. 

On the backdrop of the above information answer the questions given :

Question: 

Suppose Moloy and Niloy had decided to process multiple orders at the same time, however strictly prioritising a first come first serve basis, when would the second customer's order be considered closed ?

Option: 1

6.20 pm

 

 


Option: 2

6.18 pm


Option: 3

6.15 pm

 


Option: 4

6.12 pm


Directions for question:

Two friends Moloy and Niloy passed out from the Purulia Institute of Science and Technology with B.Tech degrees in Mechanical Engineering, but even after a year placement was hard to find. So they decided to take the challenge head-on, came down to Kolkata, rented a garage space on Park Street, and having an affinity towards making people enjoy good food, started their firm named 'B.Tech Bread-Omlette Wala'. 

They started with three items on the menu. One was the French Toast which could be prepared in 3 minutes. The second was the Egg Tortillas which took 15 minutes to prepare. Any one of Moloy and Niloy could prepare any one of them at a time. The third was the Egg Bhurji with French Fries. This however was prepared on an automated fryer which could prepare 3 servings at a time and took 5 minutes irrespective of the number of servings equal to or below 3. The fryer did not need anyone to attend to it, and the time to put in the raw ingredients could be neglected. So one could tend to the preparation of other items while the Egg Bhurji with French Fries were being prepared. 

They wanted to serve the orders as early as possible after the order was given. The individual items in any order were served as and when all the items were ready, and the order was then considered closed. None of the items on the menu were prepared in advance in anticipation of future orders. 

On the first day, 3 groups of customers came in and ordered at 6.00 pm, 6.10 pm, and 6.13 pm. The first order was for a plate of Egg Tortillas, two plates of French Toast, and three plates of Egg Bhurji with French Fries. The second order was for a plate of French Toast and two plates of Egg Bhurji with French Fries. The third order was for a plate of Egg Tortilla and a plate of Egg Bhurji with French Fries. 

On the backdrop of the above information answer the questions given :

Question: 

Suppose Moloy and Niloy had decided to process multiple orders at the same time, however strictly prioritising a first come first serve basis, when would the third customer's order be considered closed ?

 

Option: 1

6.22 pm

 


Option: 2

6.25 pm


Option: 3

6.28 pm 


Option: 4

6.30 pm


Directions for question:

Two friends Moloy and Niloy passed out from the Purulia Institute of Science and Technology with B.Tech degrees in Mechanical Engineering, but even after a year placement was hard to find. So they decided to take the challenge head-on, came down to Kolkata, rented a garage space on Park Street, and having an affinity towards making people enjoy good food, started their firm named 'B.Tech Bread-Omlette Wala'. 

They started with three items on the menu. One was the French Toast which could be prepared in 3 minutes. The second was the Egg Tortillas which took 15 minutes to prepare. Any one of Moloy and Niloy could prepare any one of them at a time. The third was the Egg Bhurji with French Fries. This however was prepared on an automated fryer which could prepare 3 servings at a time and took 5 minutes irrespective of the number of servings equal to or below 3. The fryer did not need anyone to attend to it, and the time to put in the raw ingredients could be neglected. So one could tend to the preparation of other items while the Egg Bhurji with French Fries were being prepared. 

They wanted to serve the orders as early as possible after the order was given. The individual items in any order were served as and when all the items were ready, and the order was then considered closed. None of the items on the menu were prepared in advance in anticipation of future orders. 

On the first day, 3 groups of customers came in and ordered at 6.00 pm, 6.10 pm, and 6.13 pm. The first order was for a plate of Egg Tortillas, two plates of French Toast, and three plates of Egg Bhurji with French Fries. The second order was for a plate of French Toast and two plates of Egg Bhurji with French Fries. The third order was for a plate of Egg Tortilla and a plate of Egg Bhurji with French Fries. 

On the backdrop of the above information answer the questions given :

Question: 

A fourth customer comes in and orders two plates of French Toast at 6.24 pm. Suppose Moloy and Niloy had decided to process multiple orders at the same time, however strictly prioritising a first come first serve basis. For exactly how many minutes would one of the friends be idle from 6.00 pm till serving the last customer, assuming that the four customers were the only ones to have come in within the period being discussed ?

Option: 1

9

 


Option: 2

13


Option: 3

18


Option: 4

21


Directions for question:

Two friends Moloy and Niloy passed out from the Purulia Institute of Science and Technology with B.Tech degrees in Mechanical Engineering, but even after a year placement was hard to find. So they decided to take the challenge head-on, came down to Kolkata, rented a garage space on Park Street, and having an affinity towards making people enjoy good food, started their firm named 'B.Tech Bread-Omlette Wala'. 

They started with three items on the menu. One was the French Toast which could be prepared in 3 minutes. The second was the Egg Tortillas which took 15 minutes to prepare. Any one of Moloy and Niloy could prepare any one of them at a time. The third was the Egg Bhurji with French Fries. This however was prepared on an automated fryer which could prepare 3 servings at a time and took 5 minutes irrespective of the number of servings equal to or below 3. The fryer did not need anyone to attend to it, and the time to put in the raw ingredients could be neglected. So one could tend to the preparation of other items while the Egg Bhurji with French Fries were being prepared. 

They wanted to serve the orders as early as possible after the order was given. The individual items in any order were served as and when all the items were ready, and the order was then considered closed. None of the items on the menu were prepared in advance in anticipation of future orders. 

On the first day, 3 groups of customers came in and ordered at 6.00 pm, 6.10 pm, and 6.13 pm. The first order was for a plate of Egg Tortillas, two plates of French Toast, and three plates of Egg Bhurji with French Fries. The second order was for a plate of French Toast and two plates of Egg Bhurji with French Fries. The third order was for a plate of Egg Tortilla and a plate of Egg Bhurji with French Fries. 

On the backdrop of the above information answer the questions given :

Question: 

Had Niloy been absent on that day, and assuming that the next customer's order could only be attended to when the previous customer's order was closed, at what time would the fourth customer's order (refer to the previous question) be considered closed ?

Option: 1

6:38 pm

 


Option: 2

6:42 pm

 


Option: 3

6:47 pm


Option: 4

6:49 pm


Directions for question:

The bar-graph given below shows the foreign exchange reserves of Nepal (in million Rupees) from 2014 to 2021. Answer the following questions based on the graph :

Question:

What was the percentage increase (rounded to the nearest integer, if deemed necessary) in the foreign exchange reserves in 2020 over 2016 ?

Option: 1 None

Option: 2 None

Option: 3 None

Option: 4 None

Directions for question:

The Jadavpur University’s Prince Anwar Shah Road hostel consists of two large separate buildings, one for the ladies and the other for the gents, while having a common kitchen and dining hall. It is the hostel of the CS and the EEC department of engineering students of the university.

In recognition of the growing dissatisfaction and hence complaints among the inmates of the hostel regarding the menu served for dinner, the Dean of the engineering department, Dr Aparesh Sanyal, personally decided to investigate the matter. He set about collecting information about the preference of dinner among the inmates, separately from the gents and the ladies wing of the hostel.

Dr Sanyal was able to gather the following partial information :  

 

Hostel inmates

Menu preference for dinner

Total

Egg Meal

Fish Meal

Chicken Meal

Gents

   

20

 

Ladies

     

64

Total

 

60

   

 

The Warden of the hostel was consulted, who after investigation declared that the following facts were clear :

1. Forty percent of the hostel inmates were ladies

2. One-third of the gentlemen inmates preferred an egg meal for dinner

3. Half the hostel inmates preferred either fish meal or chicken meal

Question:

What proportion of the lady hostel inmates preferred a fish meal for dinner ?

 

 

Option: 1

0.25

 

 


Option: 2

0.50

 


Option: 3

0.75

 


Option: 4

1.00 


Marketing Director

A career as Marketing Director is also known as a marketing expert who is responsible for the overall marketing aspect of the company. He or she oversees plans and develops the company's budget. The marketing Director collaborates with the business team to plan and develop the marketing and branding strategies for the company's products or services. 

4 Jobs Available
Business Development Executive

A Business Development Executive (BDE) is a professional responsible for identifying growth opportunities and fostering strategic partnerships to enhance a company's market position. Typically, a BDE conducts market research, analyses industry trends, and identifies potential clients or business prospects. He or she plays a crucial role in developing and implementing sales strategies to achieve revenue targets. 

A BDE often collaborates with cross-functional teams, including marketing and product development, to align business objectives. Strong communication, negotiation, and relationship-building skills are essential for success in this role. BDE strives to expand the company's customer base, drive sales, and contribute to overall organisational growth in a dynamic and competitive business environment.

3 Jobs Available
Content Marketing Specialist

Content Marketing Specialists are also known as Content Specialists. They are responsible for crafting content, editing and developing it to meet the requirements of digital marketing campaigns. To ensure that the material created is consistent with the overall aims of a digital marketing campaign, content marketing specialists work closely with SEO and digital marketing professionals.

3 Jobs Available
Sales Manager

A sales manager is a revenue-generating source for a company. Any organisation or company which sells a commodity or service requires sales to generate revenue. A Sales manager is a professional responsible for supervising the sales team. An Individual as a sales manager works closely with salespeople, assigns sales territories, sets quotas, mentors the members of the sales, assigns sales training, and builds a sales plan. 

The Sales Manager work also includes hiring and laying off sales personnel after evaluating his or her work performance. In bigger entities, sales quotas and plans are usually set at the executive level. He or she is responsible for overseeing the set target or quotas met by salespeople or upholding any policy. He or she guides his or her fellow salespeople and allows them to sell.

2 Jobs Available
Business Analyst

Individuals who opt for a career as a business analyst look at how a company operates. He or she conducts research and analyses data to improve his or her knowledge about the company. This is required so that an individual can suggest the company strategies for improving their operations and processes.

In a business analyst  job role a lot of analysis is done, things are learned from past mistakes and the successful strategies are enhanced further. A business analyst goes through real-world data in order to provide the most feasible solutions to an organisation. Students can pursue Business Analytics to become Business Analysts. 

2 Jobs Available
Marketing Manager

A marketing manager is a person who oversees a company or product marketing. He or she can be in charge of multiple programmes or goods or can be in charge of one product. He or she is enthusiastic, organised, and very diligent in meeting financial constraints. He or she works with other team members to produce advertising campaigns and decides if a new product or service is marketable. 

A Marketing manager plans and executes marketing initiatives to create demand for goods and services and increase consumer awareness of them. A marketing manager prevents unauthorised statements and informs the public that the business is doing everything to investigate and fix the line of products. Students can pursue an MBA in Marketing Management courses to become marketing managers.

2 Jobs Available
SEO Analyst

An SEO Analyst is a web professional who is proficient in the implementation of SEO strategies to target more keywords to improve the reach of the content on search engines. He or she provides support to acquire the goals and success of the client’s campaigns. 

2 Jobs Available
Digital Marketing Executive

Digital marketing is growing, diverse, and is covering a wide variety of career paths. Each job function aids in the development of effective digital marketing strategies and techniques. The aims and objectives of the individuals who opt for a career as a digital marketing executive are similar to those of a marketing professional: to build brand awareness, promote company services or products, and increase conversions. Individuals who opt for a career as Digital Marketing Executives, unlike traditional marketing companies, communicate effectively through suitable technology platforms.

2 Jobs Available
Back to top